CRYSTAL CLEAR PROTECTIVE COATINGS

Suppliers and applicators of long term liquid coating solutions to Commercial, Industrial, Automotive, and Marine industries
Home
INDUSTRIAL COATINGS
AUTOMOTIVE COATINGS
MARINE COATINGS
SWIMMING POOLS
STREET FURNITURE
SCULPTURES + ARCHITECTURE
PLANT AND MACHINERY
BUILDING RESTORATION
CURTAIN WALLING
PROJECTS
McLaren F1 (Woking UK)
Hilton on Park Lane (UK)
Prickly Bay (Grenada)
Unity Building(Liverpool)
Empire State Building(NY)
Lamp Posts (Brighton GB)
AON Building (LA)
Swansea LC (South Wales)
Brands Hatch Thistle (UK)
Industrial Units (Oxford)
Offices Monaco (S.France)
Yorkshire Bank (UK)
CLEANING AND PREPARATION
AUTHORISED APPLICATORS
FIND A DISTRIBUTORS
EVERBRITE COATINGS
BUY EVERBRITE NOW
About Us
Site Map
Contact Us
DATA Sheets
Protective coating for stainless steel cladding on highrise buildings
 
The "Unity Building" stands tall beside the world famous "Liver Building" on the Liverpool skyline
 

 

 

The "Pod"(box on top) of this 27 storey building is clad with 316 grade stainless steel panels.

The stainless steel cladding also extended to the over sized soffits.

The building is situated on the bank of the river Mersey about a mile from the Irish Sea.

 

BROMOCO have extensive knowledge in cleaning, and protecting all types of stainless steel finishes as well as refurbishment of rusty and pitted stainless steel.

Our unique cleaning and preparation system is unrivalled. Use of our products ensures the correct adhering of our EPC7460A protective coating, guaranteeing the longevity of protection of the finished surface against recontamination.

 

EPC7460A  is a crystal clear almost invisible protective coating specially designed for the protection of stainless steel in all environments both external and internal use, providing a hard protective barrier against all contaminants.

  

                                                     

 

 

 

     

                    

 

                    The pictures show the level of staining                     (below) shows our original test area

 

                           

 

 

        

             The harsh salt air environment had taken its toll as the stainless steel cladding on the Soffits shows

 

                       

 

                    Pictures of the cleaned and coated results,the stainless steel soffits are now fully protected

 

                       

 
 

 Working 27 floors up required a team of abseilers fully qualified in our unique cleaning and coating process.
 
                                                                     

                       
 
                                  
   All the fixing screws in the soffits were removed and replaced employing some tricky free style type abseiling

              
 
                            
 
                             
 
 The bulk of the work carried out on the soffit was from the window cleaning cradles 
 
 
 
 Completed project see's the shiney cladding and soffits fully sealed and protected 
 

 

 
 
                                            For further information email your enquiry to info@bromoco.co.uk